Beijing News News (Reporter Liuhao Nan Zhang Tong Li Yang) from Guangzhou 11 Line construction area subsidence has occurred over the past 56 hours today ( 12 Yue 3 ) afternoon, Guangzhou 11 staff number five iron wire construction Fang told the New Beijing The reporter said that at the time of the incident, five construction workers were working underground , and suddenly found that there was a leak. The evacuation immediately occurred, and the ground collapsed. "The time is very short, a few minutes." He is actively cooperating with the rescue.neteller dollar to naira exchange rate,
neteller dollar to naira exchange rate, 2019 Nian 12 Yue 3 pm, Premier Li Keqiang met with President of El Salvador's state visit to China Booker.
Copyright © 2022 Clay plastic wood carving net All Rights Reserved